MPD were engaged as the head contractor for the refurbishment of Roller Bearings Company in Melbourne. The facility underwent a major transformation in the reception area, exterior and common areas. Ceiling and flooring were replaced throughout the site, walls and doors were installed and all...

Hammondville Aged Care MPD were engaged as the head contractor for the design and construction of the new Centre for Positive Ageing and Care. Adjoining the Training Facility previously built by MPD, this lightweight construction was designed to compliment the residential surrounds while still offering a...

Greenwich Hospital  MPD were engaged as the head contractor for the refurbishment of Greenwich Hospital. The facility underwent a major transformation in the reception area, physiotherapy gym and corridors and common areas. Ceiling and flooring were replaced throughout the site, walls and doors were installed and...

St Thomas Ministry Centre – North Sydney ST Thomas Ministry CentreConstruction Value: 5.4 million.Project Description:MPD Constructions Group were engaged as the head contractor to carry out the major redevelopment of the Ministry Centre and it’s surrounding land. The project included the construction of a 3 storey building consisting...

Synergy Showroom - Hornsby MPD Constructions group were engaged to complete the building of a new display suite for Synergy in Hornsby – showcasing 1, 2 & 3 bedroom apartments and townhouses.Works included construction of floors and ceilings, internal walls featuring framed imagery of proposed apartments...

The Gallery Display Suite – Chatswood MPD Constructions Group were engaged to complete the building of a new display suite for The Gallery in Chatswood – comprising of 35 spacious and exquisitely designed apartments.Works included construction of floors and ceilings, internal walls featuring framed imagery of...

Mosman Golf Club MPD were engaged to complete the building component of this project. The club house building is a heritage listed Federation style Mansion split over two levels.Works included, extensive demolition of internal walls, floors and ceilings including complete removal of asbestos from external facade...

Neringah Hospital – Wahroonga MPD Constructions Group were engaged to complete the design and construct refurbishment works to Neringah Hospital, creating a new 19 bed Palliative Care unit to the existing ground floor. This negotiated refurbishment was successfully completed on time, within budget and to a...

Call Now Button